Elastic Networks 600 Especificaciones Pagina 85

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 238
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 84
Elastic Networks 2 BitStorm 1900 Installation and Testing
08-01101-01, Rev. 1.50 BitStorm 1900 Installation and Maintenance Guide 2-63
Task 004: Installing the Air Baffle
Use this procedure to install the BitStorm 1900 Air Baffle.
Requirements
This procedure requires the following:
Phillips head screwdriver (#1 or #2)
Step Procedure
1.) Verify that the mounting adapters are in the same position as the
BS 1900 and the Filter Shelf (i.e., mid-mount or flush mount).
2.) Place directly above the BS 1900 or Filter Shelf.
3.) Secure with mounting screws.
STOP
Vista de pagina 84
1 2 ... 80 81 82 83 84 85 86 87 88 89 90 ... 237 238

Comentarios a estos manuales

Sin comentarios